Hi all,
I am performing calibration process in my plant. I'm following all the steps as given, I've generated the inspection lot. My query is that once the lot is generated, and the QM team has updated the results for each operations, if the result is NOT OK , then before updating the usage decision is there any way to perform re-calibration without generating other work order?