Hello
I'm having a KMAT material as a component to upper level and that is a own-produced component. The characteristic is transferred from finished product with a dependency. Now I can get a planned order and convert it to a production order but the goods receipt is always zero. That's because I don't have a standard price assigned in material master of KMAT. The reason is that it doesn't have a fixed price. I'm expecting the planned cost of production order can be transferred to goods receipt of KMAT. Is it possible?
milk