Hi experts,
I am using the PI 7.1 system and I have a scenario where I have to receive the input files from different Source system.
so I have used the CCBPM concept which receives the multiple input files and then Transforms it to the single message and then
Target file will placed to the single target system.
I have exactly followed the approach as mentioned in above link (only difference is I haven't used the Block step)
All three File sender channels reading the input files and I can see three separate messages in PI SXMB_MONI (used the Process view), the same is shown as below.
Data payload for one of the three message. Here I have a query what is the meaning of Transfer to Process engine
Issue is my BPM design is not progressing further after receiving the Three input messages, it should be the Transformation step to be executed next.
from where I can see the Graphical log for each Integration process instance so that I can find from where the BPM execution gets stopped.
just by seeing the input messages from SXMB_MONI it is very difficult to troubleshoot.
please suggest me.