Client had a public holiday calendar in which a particular holiday (fixed date) would move to a Monday if it fell on Saturday/Sunday and it was likewise configured in system. Client proposed a change in requirement for that particular holiday not to move to a Monday if it falls on Saturday/Sunday. This was changed by making the holiday with fixed date and Not Guareented. Work schedule was generated again and calendar reflected as expected. However when pt60 was run for a pernr the Public Holiday Quota in 2006 was showing as 7.00 (7 hours is the pernr daily work schedule Monday to Friday). Client says it should reflect 0 and not 7.
I tried changing Public Holiday class for the holiday from 3 to 1 and re-generating work schedule again and running pt60, however showing same result.
Please advise.