Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8644

Finish product COA MIC to be achived from the bulk material MIC.

$
0
0

Dear All,

 

I have a situation where the MIC is to be fetched from the Bulk material to the COA of finish product,

 

For example:

 

Bulk material A is having the MIC X,Y,Z maintained in the inspection plan and certificate profile TEST is created and the MIC are maintained, Material A ia assigned to the profile, after the result recording the certificate is produced with MIC X,Y,Z.

 

Now for the finish product B the MIC D is maintained in the inspection plan and material is assigned to the same certificate profile TEST which is having the MIC X,Y,Z.

 

now the result recording and the UD is taken for the inspection lot with 04 origin and COA is created the COA should appear with MIC X,Y,Z can anyone help me out how this can be done

 

The user has shown the example where this scenario is working fine but for some materials it is not working when both the material are maintained same.

 

Regards,

Naveen.


Viewing all articles
Browse latest Browse all 8644

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>