Hi Kiran /Mariano ,
In my case number range interval group was already maintained in both the server & I didn’t have to create it separately & client wants to have same number range for new order type . When I copied the old order type through “OPJH” to create new order type & done all the other seting .. Then after I saw in CO82 it has already taken the same number group like old production order type have in “Dev” . I didn’t assign it manually anywhere .
In Dev system number range is maintained as below for new order type
100000000 – 199999999 1000000020
When this setting was transported to “Quality” then new order type was automatically assigned to same number group .
In Quality system number range is maintained as below for new order type
100000000 – 199999999 1000038750
When setting was transported to Quality it has not overwrite the current number & started giving number like 1000038751..etc .
My question is if we transport the order type setting in “PRD” so will it create inconsistency or not .
In Quality I don’t see any problem .
Thanks ,
Regards ,
Aman