Hello,
Please let me know if there are any specific notes/pre requisites to follow when upgrading SAP HR and EA HR to EHP7, we already have fresh SAP ERP 6.0 EHP7 technical usage central application is installed.
Approach to be followed is to generate stack.xml for both these s/w components and upgrade using saint.
How much minimum space constraints to be allotted at DB and OS level (Oracle & AIX)
Kindly throw some light on the above queries.
Thanks